WindIQDEMO
Wind Farm 2 · 42 MW · 14 turbines (8 monitored)
FLEET AVAILABILITY
96.2%
rolling 30 days
POWER CURVE CONFORMANCE
80.1%
vs IEC reference curve
RECOVERABLE LOSS
134 MWh/yr
≈ ₹6.0L at PPA rate
TURBINES FLAGGED
3 / 8
1 critical, 1 warning
TURBINE FLEET — POWER CURVE CONFORMANCEclick to diagnose
WTG-013.0 MW
97%NOMINAL
WTG-023.0 MW
95%NOMINAL
WTG-033.0 MW
58%CRITICAL
WTG-043.0 MW
91%NOMINAL
WTG-053.0 MW
76%DEGRADED
WTG-063.0 MW
94%NOMINAL
WTG-073.0 MW
41%CRITICAL
WTG-083.0 MW
89%NOMINAL
AI DIAGNOSIS — WTG-07CRITICAL · 41% conformance
Gearbox bearing vibration RMS up 3.1x baseline over 9 days, correlated with oil temp drift.
Recommended action
Ground turbine, borescope inspection within 48h.
GENERATION vs FORECAST (MW) · 48h
LOSS ATTRIBUTION (MWh/yr)
Simulated data · WindIQ integrates via existing SCADA/OPC-UA — no turbine controller changes required